Subcontractor Compliance Documents: Checks by Country
Subcontractor compliance documents: which field to compare with which register, what a mismatch looks like, and how the UK, France, Spain, Belgium and Germany differ.

Summarize this article with
In the UK, a contractor in the Construction Industry Scheme (CIS) must verify a subcontractor with HMRC before the first payment, and again if the subcontractor has not been paid in the current or previous two tax years. Other countries run the same idea on a tighter clock: France requires a vigilance certificate at signature and every six months. Whatever the country, the useful check compares a field on one document with the same field on another document or an official register. Collecting the paperwork is only the first half. This article is general information as of November 2026, not legal advice.
What "subcontractor compliance documents" should actually answer
A subcontractor file answers four questions: who is this legal entity, are its tax and social obligations in order, is it insured for the work, and who is actually on site. Each question maps to a document, and each document has a field you can compare.
The typical UK file holds a company or UTR record, a CIS payment status, an insurance certificate, a health and safety record, and bank details. Our companion piece on construction subcontractor documents lists them. This article is about the comparisons between them.
The cross-check matrix
Every row below is a comparison between two sources, with a defined action when they disagree.
| Field | Document A | Compared with | Typical mismatch | What the reviewer does |
|---|---|---|---|---|
| Legal name, company number | Contract, invoice | Companies House record | Trading name on invoice, dissolved company | Ask which entity does the work; pause onboarding |
| UTR, CIS status | Subcontractor's details | HMRC verification result | "Unmatched", name or UTR differs | Treat as unmatched, apply the higher rate, ask for corrected details |
| Insured entity, activities | Insurance certificate | Contract scope | Different named insured, work at height not covered, expired | Request a corrected certificate |
| Bank account holder | Invoice, bank letter | Supplier record | New account, different holder | Call back on a known number before paying |
| Operatives on site | Subcontractor's list | Site sign-in, cards, right-to-work records | Worker on site, absent from list | Remove access until documents are supplied |
| Certificate date | Any dated certificate | Contract renewal calendar | Lapsed, never re-requested | Block the next payment application |
This matrix shows whether the file is consistent and whether its facts match a register. It does not prove that any single document is genuine.
The UK mechanism: CIS verification
Under CIS, the contractor must check the subcontractor's status with HMRC before the first payment, because that check sets the deduction rate: 20% for registered subcontractors, 30% for unregistered ones and 0% for those with gross payment status (GOV.UK, CIS contractor guidance). If HMRC cannot match the details, the subcontractor is treated as unmatched and the higher rate applies, according to HMRC's own manual (CISR13110).
The comparison here is concrete: the legal name, UTR and company details you hold against what HMRC returns. A mismatch means the record does not match, not that the subcontractor is dishonest. Typical causes are a trading name instead of the registered name, a typo in the UTR, or a subcontractor that has changed from sole trader to limited company without telling you.
What CIS verification proves is tax status for deduction purposes. It does not tell you whether the insurance covers the job, whether the operatives have the right to work, or whether anyone has been paid.
Ready to automate your checks?
Free pilot with your own documents. Results in 48h.
Request a free pilotHow other countries run the same check
France, Spain, Belgium and Germany each tie the contractor's exposure to a different certificate or register, so a multi-country contractor needs a per-country rule, not a single checklist.
| Country | Mechanism | What it shows | Rhythm |
|---|---|---|---|
| France | Vigilance certificate under Code du travail art. D8222-5 (Lรฉgifrance) | Social declarations and contributions up to date, verified online with URSSAF | At signature and every six months, contracts of 5,000 euros excl. VAT or more |
| Spain | Contractor certificate, art. 43.1.f of the General Tax Law (AEAT) | Tax situation of the subcontractor at the certificate date | Renewal period read as twelve months in Junta Consultiva guidance; confirm against current text |
| Belgium | Withholding check under art. 30bis (ONSS) | Whether social or tax debts trigger a withholding at consultation | Valid only at the moment of consultation |
| Germany | Principal liability under section 14 AEntG | Liability like a guarantor for the sector minimum wage | Not tied to a single certificate |
France is the closest to a fixed six-monthly cycle. A French contractor checks the vigilance certificate against the URSSAF verification service, then repeats the check every six months until the contract ends. Belgium links the check to the invoice: where a debt exists, 35% of the invoice is withheld for social debts and 15% for tax debts, according to the ONSS service. Germany has no equivalent certificate cycle for the contractor; liability follows the contracting chain, and the Federal Labour Court has held that a pure developer who passes on no obligations of its own is outside section 14 (case 5 AZR 241/18).
For a UK contractor, the practical lesson is that foreign subcontractors bring their own certificate, and the comparison you run is the same: entity name and number, date, and a verification against the issuing body, not just a PDF.
What to do when fields disagree
| Mismatch | Immediate action | Escalate when |
|---|---|---|
| CIS record unmatched | Apply higher rate, ask for corrected UTR and name | Subcontractor does not respond before next payment |
| Different legal entity on insurance | Request new certificate naming the contracting entity | Work already started under the wrong entity |
| Foreign certificate older than its cycle | Request a fresh one; record the check date | Work continues without a valid certificate |
| Operative not on the list | Remove site access, request documents | Repeat within the quarter |
| Changed bank details | Call back on a known number, hold payment | Supplier cannot confirm |
Keep a note of the mismatch, the question asked and the answer. An auditor wants that trail more than the PDFs.
Questions subcontractor managers ask
Site and procurement teams often ask whether they must check their subcontractor's subcontractors. The answer depends on the country, and the practical step is to ask for the lower tier's details and apply the same comparisons. They also ask whether a clean certificate means the subcontractor pays its workers. It does not: each certificate describes one obligation at one date.
For ongoing renewal tracking, see the vendor certificate verification guide. A three-column tracker (subcontractor, document, next check date) is enough to start.
Where a tool helps
Running these comparisons by hand across dozens of subcontractors, in several countries, is where files drift. A document validation tool extracts the fields (legal name, registration number, dates, account holder) from each upload, compares them across the file and flags mismatches for a person to decide. It checks completeness, validity dates and consistency, and it does not certify that a document is authentic. See the construction and subcontractor solution, the security page and pricing. The sector overview is in the industry verification guide.
Frequently Asked Questions
What documents do I need from a subcontractor?
Legal entity details, tax or CIS status, an insurance certificate, a list of operatives with their right-to-work and trade cards, and bank details. Then compare them with each other and with the contract.
How often should subcontractor documents be re-checked?
At each expiry date, whenever the legal entity, site list or bank details change, and for CIS if the subcontractor has not been paid in the current or previous two tax years. France sets a fixed six-month cycle for its vigilance certificate.
Does CIS verification prove a subcontractor is compliant?
No. It confirms the subcontractor's tax status with HMRC and sets the deduction rate. Insurance, right to work and wage payment need separate checks.
Can one checklist cover several countries?
The comparison logic can be shared (entity, date, register, mismatch action), but the certificate and the rhythm are specific to each country.
Stay informed
Get our compliance insights and practical guides delivered to your inbox.